Pay less
Twelve months of bills and the load shape: peak windows, demand charges, genset hours, top slab. If storage does not move them, we say so.
Power for critical loads
C&I battery cabinets and containers, stocked and supported in the UAE. You keep the stamp and the client.
Great Power technology · Wattn supply and support in the UAE
The PV job is priced. The client asks about sunset, peak, genset. You need an answer this week, not a sourcing project.
Options are thin. A brochure trader with no stock. A famous brand uninterested in one cabinet. A container with no certificate pack.
Meanwhile the site pays the top slab: 0.38 plus 0.06 fuel surcharge, 0.44 AED/kWh on DEWA's published tariff, and burns unbudgeted diesel.
You keep the stamp. We keep the stock, the QC and the paperwork.
DEWA published commercial tariff, top slab + fuel surcharge
dewa.gov.ae · slab tariff · fuel surcharge table
In that order. Storage earns its place on the bill first, the risk register second, sustainability last.
Twelve months of bills and the load shape: peak windows, demand charges, genset hours, top slab. If storage does not move them, we say so.
Stock held in the UAE. Incoming QC before handoff. L1/L2 support in UAE hours, factory L3 behind it. A spare part is a phone call.
Every diesel hour shifted onto stored solar is fuel not burned and a genset not serviced. Measured, not claimed — it survives a sustainability review.
The line is narrow on purpose. Three units cover most UAE C&I sites, so we know the datasheets, footprints and failure modes.
Roughly 260 kWh class, liquid-cooled cabinet
Hero unit for mid-size sites: a hotel, a factory floor, a warehouse with an evening load.

Roughly 418 kWh class cabinet
Step-up DC block for larger single-site loads, or where a PCS is already on the drawing.

Roughly 5 MWh class, 20-foot container
One size up for heavy industrial and multi-MWh sites, where cabinets stop making sense on space.

Great Power technology · Wattn local supply and support. We are not the manufacturer. Renders carry factory branding for now.
Six layers, each with the question a careful engineer asks. Exact figures come from the SKU datasheet at quote stage, not here.
LFP chemistry chosen for cycle life and thermal behaviour in Gulf heat, not headline numbers.
What is the cell code, the Ah rating, the tested temperature window?
Modules matched at the factory, so a field replacement is a swap, not a rebuild.
How are cells matched, and what is the replaceable unit on site?
Liquid cooling holds a tighter band through a Jebel Ali August, where cycle life is won.
What ambient is the design rated to, and what if cooling fails?
Outdoor-rated cabinet or 20-foot container, sized to land on a slab your civil engineer will sign.
What is the ingress and corrosion rating, the footprint, the point load?
BMS, PCS interface, EMS, fire detection and suppression, with the certificate pack your consultant expects.
Which certificates cover this model, and where is the fire test report?
Cabinets stack and containers repeat, so phase two scales without a new approval story.
How do units parallel, and what changes at the common coupling point?
Six steps, the same sequence every time. You hold the client and the stamp throughout.
Send twelve months of bills. We read the slab, peaks, demand charge, genset hours.
Kit recommendation against your load shape. If the case is thin, you hear that.
Written quote against a named SKU and datasheet, with lead time and scope split.
Deposit releases the factory PO and your slot in production, registered in your name.
Incoming QC, delivery with the document pack. Your enrolled crew installs. Approval stays yours.
L1/L2 in UAE hours, factory L3 behind, spares local. A person, not a queue.
Power for data infrastructure — the same units behind racks, halls and cooling, at colocation and enterprise sites.
No. Wattn is a distributor. Great Power New Energy Co., Limited builds the cells, cabinets and containers in Hong Kong. We add UAE stock, incoming QC, the document pack and local support.
No. The agreement is non-exclusive both ways. Great Power can appoint others; we are not barred from other lines.
Wattn Limited, Masdar City Free Zone, Abu Dhabi, licence MC 14897, with battery energy storage supply on the licence. Trade licence shared on request.
No. We supply, size and support. Installation and commissioning run through DEWA-enrolled or ADDC-capable EPC partners, often the contractor already on site. You keep the stamp and the margin.
The Great Power warranty passes through on the terms of the SKU datasheet, with Wattn L1/L2 support in the UAE. The exact term is confirmed in writing at quote stage.
GCC and West Asia, non-exclusively. The first jobs are Dubai and Abu Dhabi, where we hold stock, spares and support hours. Outside the UAE we are straight about logistics.
It depends on the SKU, the production queue and local stock. You get a written lead time in the quote, confirmed against the factory PO.
The START SET: Magna-C&I-260 for mid-size sites, Magna-UTL-418 for larger single-site loads, MAX-20HC-5000 for heavy industrial. Larger units can be quoted; these three we stock.
Bill audit, sizing, then a written quote. There is no published price list: price moves with SKU, quantity, delivery terms and scope split. Anyone quoting AED per kWh unseen is guessing.
Book a bill review below. Bring one live PV job or diesel-heavy site, plus twelve months of bills. Thirty minutes, one straight answer.
Thirty minutes with the person who handles the job. Send one live PV job or one diesel-heavy site; we reply within five business days.
Power for critical loads
Great Power technology · Wattn supply and support in the UAE